Smart Pet Devices
Smart Pet Device
PCBA & Product Assembly
Manufacturing support for customer-designed pet feeders, water fountains and connected accessories. From component sourcing and PCB assembly to functional testing and product assembly, with the scope agreed for your project.
Have a sample or product specification? Share what you have for an initial manufacturing review.

Product applications
Manufacturing Support for Feeders & Fountains
Explore manufacturing support for your feeder or fountain design. Product images are illustrative concepts.

Automatic Pet Feeders
Control-board assembly for motor drivers, sensors and user interfaces, with wiring and enclosure assembly assessed against your design.
Discuss a Feeder Project
Smart Pet Water Fountains
PCB assembly for pump control and water-level sensing, plus specified connectors and product assembly after interface review.
Discuss a Fountain ProjectOther connected pet devices
Trackers, wearables, smart pet doors and accessories can be reviewed from your board files, BOM and test requirements. Wireless, battery and actuator requirements are assessed for each design.
MANUFACTURING & DELIVERY SCOPE
From PCBAs to Assembled Products
Select the services your project needs. We review your design, parts and instructions to define the build and delivery scope.
PCBA Manufacturing
Component sourcing, SMT and through-hole assembly, customer-supplied firmware programming, and agreed board-level checks.
- DELIVERY
- Assembled PCBAs to the agreed build and test scope.
- FOR REVIEW
- Gerbers, BOM, placement files and available firmware or test instructions.
Product Assembly
Integration of PCBAs, wiring, connectors and customer-supplied or approved enclosures and mechanical parts.
- DELIVERY
- Assembled products or subassemblies, as specified.
- FOR REVIEW
- Assembly drawings, parts list and who supplies each part.
Testing, Packaging & Delivery
Agreed functional checks, approved labels and packaging, and preparation of release records.
- DELIVERY
- Tested, packed units with the agreed documentation.
- FOR REVIEW
- Test methods, acceptance limits, label artwork and packaging requirements.
Services can be combined. Final scope, part-supply responsibilities and acceptance criteria are confirmed in the quotation and before production.
QUALITY & TESTING
Testing Defined for Your Product
Share your product specification and available test instructions. Before a pilot build, we agree the checks, acceptance criteria and records needed for your order.
FROM REVIEW TO SHIPMENT
From Prototype to Production
- 01
Project review
Share your available files, product requirements, quantities and target schedule.
- 02
Source & quote
Confirm build risks, component supply and quotation scope.
- 03
Pilot build
Review first boards, firmware and agreed test results.
- 04
Production
Build to approved assembly and testing instructions.
- 05
Release & ship
Complete release checks, records and agreed packaging.
Project questions
Before Your Pet Device Build
Clarify product assembly, available files and the next step for your project.
Discuss Your Pet Device Project →Can you assemble the finished product as well as the PCB?
We can assess product assembly based on your design, approved parts and acceptance requirements. Send the enclosure and mechanical information, wiring details, firmware and test specification so we can confirm the build scope.
Can I enquire without a complete BOM or Gerber package?
Yes. Start with a product specification, sample photos, project stage and estimated quantity. We will identify the information needed for a manufacturing review. A confirmed production quotation requires sufficient design, material and testing details.
Are the pictured products available for immediate private-label orders?
The images are illustrative concepts, not a catalogue of stocked or previously delivered Vosnor pet products. Share your target product and branding requirements; any available supply or customization route must be confirmed separately.
Do you develop the app and firmware?
Our manufacturing offer includes programming customer-supplied, released firmware. App development, firmware development and complete product design are not included. Please identify your design partner and available files when discussing a build.
How are testing, minimum quantities and lead times agreed?
These depend on your BOM, component availability, assembly scope and test plan. Special fixtures, RF or environmental testing and finished-product certification are reviewed separately. We confirm quantities, schedule and acceptance criteria in the quotation.
Smart Pet Devices
Let’s Review Your Pet Device Project
Tell us what you want to build and which manufacturing support you need. You can start with a specification, sample photos or production files.
What to share
- Product type, project stage and estimated quantity
- Available specifications, sample photos or board files
- Required assembly scope, testing and target schedule
What happens next
Requirement review → Scope clarification → Quotation next steps
Send Your Enquiry
Fields marked * are required. Attachment limit: 10MB per file.